VVGMKITCHEN & BATH

Bathroom / Austin, Texas

Bathroom remodeling planned from the waterproofing out.

VGM handles complete bathroom renovations, walk-in showers, tub-to-shower conversions, tile, vanities, fixtures, lighting, flooring, and finish work—with close attention to what sits behind the tile.

Request an estimate

Owner-involved · Clear scope · Detailed finish work

What the project can include

Start where your room needs it.

The visible tile is only one part of the room. Preparation, drainage, ventilation, waterproofing, fixture placement, and finish transitions need to be resolved before the final surfaces go in.

Credibility through the details

The finished room depends on decisions you cannot see later.

The shower assembly, fixture placement, vanity dimensions, lighting, glass, and finish transitions are connected. Planning them together reduces surprises and protects the design.

A beautiful shower starts behind the tile.

Careful preparation and waterproofing are critical to long-term shower performance. VGM plans the wet-area assembly, drainage, penetrations, and finish layout before the tile becomes the focus.

Build the shower around daily use.

Walk-in access, a tub-to-shower conversion, niches, benches, controls, large-format tile, and frameless glass all affect one another. Those details should be resolved as one layout.

A vanity should fit the room—and the people using it.

Height, storage, sink placement, countertop space, lighting, and room dimensions can be considered together instead of defaulting to a standard cabinet.

Request an estimate

Owner-involvedDirect communication stays connected to the work.

Details considered earlyLayout, waterproofing, materials, and transitions are planned together.

Respect for the homeProtection, cleanup, and finish quality are part of the scope.

A clear remodeling process

Know what happens next.

Every project is different. The sequence should still feel organized, understandable, and accountable from the first conversation to the final walkthrough.

01

Tell us about the room

Share the space, what is not working, and the level of change you have in mind.

02

Consultation and measurements

We look at the existing conditions, priorities, access, and the details that shape the scope.

03

Scope and estimate

The work, selections, allowances, and key decisions are clarified before scheduling.

04

Selections and planning

Materials, fixtures, layout details, and project sequencing are organized around the approved scope.

05

Remodeling work

The room is protected, work is coordinated, and questions stay connected to the person responsible for the project.

06

Final walkthrough

We review the finished details together and close the remaining items before the project is complete.

Questions homeowners ask

Clear answers before work begins.

Specific details depend on the room, materials, and existing conditions. These answers explain how VGM approaches the conversation.

Can you remodel an existing shower without changing the entire bathroom?

A shower-only project may be possible when the surrounding room and existing conditions support a focused scope. The first step is understanding the shower, access, and any related surfaces.

Do you install large-format tile?

Large-format tile can be included where the room, substrate, layout, and material are appropriate. Planning the cuts, edges, transitions, and alignment is part of the conversation.

What matters most in shower waterproofing?

The system behind the finished tile needs careful preparation, drainage planning, waterproofing continuity, and attention at penetrations and transitions. The correct approach depends on the existing conditions and selected system.

Can you help choose a vanity and fixtures?

Yes. Vanity dimensions, height, storage, sink placement, lighting, and fixture compatibility can be considered together during planning.

How long does a bathroom remodel take?

Duration depends on the scope, material availability, existing conditions, inspections or trade coordination where applicable, and the details of the room. The sequence is discussed after those factors are understood.

Can I stay in the home during the work?

Often that depends on access, dust-control needs, whether another bathroom is available, and how much of the home is affected. VGM discusses the practical impact before scheduling.

A practical first conversation

Ready to make the room work?

Share the room, your location, and the level of change you have in mind. Photos can follow after the initial contact.

Request an estimate
Request an estimate